M53 Junction 11, Ellesmere Port Highway Rehabilitation
Swift completion of works to the central reservation along a key section of the M53 have paved the way for an upgraded safety barrier installation Project Summary National… Read More »
Swift completion of works to the central reservation along a key section of the M53 have paved the way for an upgraded safety barrier installation Project Summary National… Read More »
Project Summary The £20 million A16 Levelling Up Fund improvement scheme saw a total of five transport projects carried out along the A16 corridor between Boston and Spalding –… Read More »
Kilkern excavated launch and reception pits in preparation for direction drilling along an 11 mile length of the M6 motorway in Lancashire. Principal contractor Costain appointed Kilkern to… Read More »
The Kilkern team were engaged by Cleshar to carry out a civils package to service the construction of two new buildings within the existing Stoke Rail Depot facility.… Read More »
Lostock Sustainable Energy Plant (LSEP), is a new £480 million energy from waste (EfW) facility located at the Lostock Works site near Northwich in Cheshire. It will recover… Read More »
Costain appointed Kilkern to deliver a civils package to prepare the hard shoulder for full time traffic running between junctions 21a and 26 of the M6 in Lancashire.
During the design phase of this project, GallifordTry asked the Kilkern team to help plan a scheme to widen the existing road at Bucknall New Road in Stoke-on-Trent.
Project development Kilkern were asked to advise on the design and development of a scheme to improve the traffic flow around the roundabout at Joiners Square. The project… Read More »
The scope of the scheme is to widen both the Northbound and Southbound carriageways of the existing A500 from two to three lanes between Wolstanton and Porthill Junctions.… Read More »
Kilkern have undertaken a number emergency repairs on the highway including bridge deck repairs, waterproofing, drain repairs etc all at short notice. Due to the locations of most… Read More »
The scope of work included the installation of new carrier drain and catchpits including carriageway reinstatement along Chapel Lane to alleviate flooding that would occur annually from the surrounding fields.
Kilkern Specialist Labour supply has over twenty groundworkers and pipelayers on the Maple Cross HS2 site in Buckinghamshire where 1.4 miles of track will be installed just south… Read More »
Kilkern labour hire had over 25 workers for Cleshars including, groundworkers, shuttering carpenters, steelfixers, pipelayers, dumper drivers and 360 operators. The works were the refurbishment and re-track alignment… Read More »
Kilkern have between 50 and 100 trackmen out most weekends on safety critical network rail works with Keltrbray and other clients. These workers are engaged in trackworks throughout… Read More »
Kilkern in joint venture with Capital Group were successfully appointed to manage all of Barhale’s recruitment. Noel Hanley Group Operations Director of Barhale choose Capital Kilkern due to… Read More »
Beckton, located in the London Borough of Newham, is one of Europe’s largest sewage treatment works, and currently serves 3.5 million people. As part of Thames Waters ?190m… Read More »
Crossness currently serves two million Londoners. On completion of the upgrade next year, the site?s treatment capacity will be boosted by 44 per cent. This will significantly reduce… Read More »
Due to record rainfall in 2013 Affinity Water needed to call in extra teams of Leakage Engineers to detect leaks that were springing up throughout their network. Amey… Read More »
As part of the Costain/Skanska £250m redevelopment of Paddington Station Kilkern provided skilled labour for the enabling works. Paddington was the first of Crossrail’s Central London station redevelopments.Paddington… Read More »
Taylor Woodrow has been appointed for the design and planning stage of the Croxley Rail Link, a £118m scheme which will bring the London Underground to the centre… Read More »
Kilkern were selected by UKDN Waterflow to be their main supplier for London and the South East on a 2 year contract covering LUL and Network Rail works.… Read More »
Kilkern groundworkers and deep drainage operatives were supplied to Instalcom and Morrison Utilities to work around the clock to get the northern approach to the Blackwall Tunnel open… Read More »
Balfour Beatty have been appointed to deliver up to £180m of infrastructure work at Heathrow Airport during May 2014. Over the next three years the company will work… Read More »
Contact us now if you looking for a Highways and Infrastructure contractor, Specialist Labour Supplier or Operated Vacuum Excavator hire company, with an impeccable health and safety record, that will get the job done right first time.







